The Texas Landscape Irrigator license in order: the Basic Irrigator course, the TCEQ application and $111 fee, the approval letter, the exam, and the license.

Published 2026-10-29

A Texas Landscape Irrigator license comes in five steps: pass the Basic Irrigator course, apply to the Texas Commission on Environmental Quality (TCEQ) with the $111 fee, wait for the approval letter, pass every section of the exam at a testing center, and receive the license.

30 TAC 30.120(b) gives the Landscape Irrigator license three conditions: meet the general application rules of Subchapter A, “complete and pass the basic irrigator training course”, and “pass all sections of the applicable examination”. No education and no work experience come into it; TCEQ says on its irrigator license page that neither is required. What follows is the order those steps run in, and what each one asks.

Occupations Code 1903.251 requires a license of anyone who sells, designs, installs, maintains, alters, repairs or services an irrigation system, consults on one, or connects one to a water supply. The license page lists all of that work, the connection to a water supply included, under the Landscape Irrigator license.

1. The Basic Irrigator course

The course comes first, and the rule asks for more than attendance: an irrigator has to complete it and pass it. The irrigation technician license in 30.120(c) asks only that its course be completed, so the word “pass” is particular to the irrigator.

TCEQ approves the providers. Its training page lists one required course for a new Landscape Irrigator license, the Landscape Irrigator Course (course code 10), with no electives. The approved course data set that page links to lists 13 offerings of that course. All 13 are classroom courses, two of them also offered live online, and they run 32, 36 or 40 hours. None is self-paced. TCEQ staff told the Irrigator Advisory Council in August 2025 that they had received an application for a self-paced irrigator course, which would be the first (council minutes, p. 2); minutes are a record of what was said and not a rule.

This site names no provider and ranks none. The list on TCEQ’s training page is the one to choose from.

TCEQ’s outline of the course is printed in its curriculum guidance for inspectors (January 2013, revised June 2024), because the inspector license needs the same course. It says the course “should contain not less than 32 hours of instruction” and covers four blocks: an introduction to landscape irrigation and its rules; design (component parts, site evaluation, plan preparation and interpretation, head layout, hydraulics and practice designs); installation (connection to the water supply, backflow prevention, trenching and backfill, pipes and fittings, drip); and testing, maintenance, operation and troubleshooting. The guidance also warns that the course “does not fully prepare an individual to enter the business of landscape irrigation”.

2. The application, the attestation and the fee

After the course, the application goes to TCEQ through its online application. The license page lists what goes with it: a criminal history attestation and the $111 fee. That fee is 30 TAC 30.30(c) under the rule in force since September 29, 2016: $111 for a three-year license, paid with the initial application and nonrefundable.

30 TAC 30.18(a) puts the application before the exam: it “must be submitted to the executive director before the applicant may take the examination”. If TCEQ writes back about a deficiency, 30.18(g) gives 120 days from that notice to fix it and tell TCEQ, or the application is treated as expired.

TCEQ then mails an approval letter. The license page puts processing at about three to four weeks when nothing is missing.

3. Booking the exam

The approval letter is what a test center wants to see. TCEQ’s computer-based testing page tells candidates to book with a registered test center once the letter arrives and to bring the letter to the exam. Two practical points from TCEQ’s own pages:

  • The Landscape Irrigator exam has a 6 hour time limit, and “not all CBT centers can accommodate more than 4-hour exams”. Confirm with the center before booking.
  • Each center may charge its own testing fee on top of the $111, and some centers do not refund it.

The approval does not last indefinitely. 30 TAC 30.20(d) ends an application 365 days after the date of application, or on a fourth failure of the same examination, whichever comes first; a new application and a new fee follow. (30.18(c) words it as one year from the date the application is approved, so count from the earlier date to be safe.)

4. The exam

The rule asks for every section. The minimum passing score is 70 percent (30.20(b)), and the license page applies it to each section. This site’s practice questions are split into Installation, Backflow, Hydraulics and Design.

5. The license

When every requirement is met, 30.18(i) has TCEQ issue the license, and its effective date is the date TCEQ issues it. The testing page lists the license as issued to applicants who pass within one week of the exam date. Under 30.30(a) it runs three years.

One more effect of that last step: the license page says a current irrigation technician license “will be expired upon issuance” of the Landscape Irrigator license, because the irrigator license covers the same work.