Case note
As-built and controller sticker: the Bower orderA September 2024 TCEQ agreed order settled alleged breaches of 30 TAC 344.61(e), 344.62(b)(3), 344.63(2) and (3) and 344.35(d)(11) at one Schertz job: $1,546.
Guides to the exam, bulletins when a rule moves, and case notes on published enforcement decisions.
Case note
As-built and controller sticker: the Bower orderA September 2024 TCEQ agreed order settled alleged breaches of 30 TAC 344.61(e), 344.62(b)(3), 344.63(2) and (3) and 344.35(d)(11) at one Schertz job: $1,546.
Guide
Test day for the TCEQ Landscape Irrigator examThe approval letter, a pen or pencil, scratch paper and a non-programmable calculator, nothing else. Booking a six-hour seat, the exam screens, and submitting.
Guide
Friction loss and the 5 ft/s limit in PVC30 TAC 344.62(d) holds PVC to 5 ft/s. Velocity and friction loss worked from this site's Hazen-Williams table by pipe size and class, beside a printed chart.
Guide
Backflow heights: RPZ, PVB and SVBThe 12 inches in 30 TAC 344.50(b), worked out: an RPZ from the ground, a PVB or SVB from the downstream piping and highest downstream opening, and the air gap.
Records of rule changes that touch the exam, with the date each takes effect.
A Texas Register proposal of August 14, 2026 would align 30 TAC 30.24 with Water Code 37.006: late renewal up to 180 days at a higher fee. Not adopted yet.
Reference pages on how the exam and its rules work.
The approval letter, a pen or pencil, scratch paper and a non-programmable calculator, nothing else. Booking a six-hour seat, the exam screens, and submitting.
30 TAC 344.62(d) holds PVC to 5 ft/s. Velocity and friction loss worked from this site's Hazen-Williams table by pipe size and class, beside a printed chart.
The 12 inches in 30 TAC 344.50(b), worked out: an RPZ from the ground, a PVB or SVB from the downstream piping and highest downstream opening, and the air gap.
One foot of water is 0.433 psi and one psi is 2.31 ft of head. Worked for static pressure uphill and downhill, and for design pressure under 30 TAC 344.1(9).
The Texas Landscape Irrigator license in order: the Basic Irrigator course, the TCEQ application and $111 fee, the approval letter, the exam, and the license.
Advisory council minutes of 2019 to 2024 put TCEQ Landscape Irrigator pass rates at 53.3 to 64.0 percent. What they count, and what is said of the revised exam.
Summaries of published enforcement decisions, with their citations.
Each post is checked against its sources before it goes out, and mistakes still get through. Write to us and it gets corrected. New posts go out on the RSS feed.