As-built and controller sticker: the Bower order

A September 2024 TCEQ agreed order settled alleged breaches of 30 TAC 344.61(e), 344.62(b)(3), 344.63(2) and (3) and 344.35(d)(11) at one Schertz job: $1,546.

Published
2026-11-16

On September 10, 2024, the Texas Commission on Environmental Quality (TCEQ) adopted an agreed order with Gerald Bower dba TLC TOTAL LAWN CARE LLC, a licensed irrigator with a business in Selma. TCEQ alleged four violations on one installation in Schertz, under five provisions of 30 Texas Administrative Code (TAC) Chapter 344: a head spraying onto an adjacent property (344.62(b)(3)), plan changes left off the as-built (344.61(e)), no sticker on the controller (344.63(3)) and no completed maintenance checklist (344.63(2)), the last two also under 344.35(d)(11). The order settled those allegations for a $1,546 penalty. It also records that the occurrence of any violation is in dispute, that the order is not an admission, and that the respondent generally denies each allegation. The signed order is on TCEQ’s Commission Issued Orders database as Docket No. 2023-1652-LII-E.

What TCEQ alleged

The allegations come from a record review of the business on November 9, 2023, and all four concern one system. As the order words them, the respondent:

  1. installed a system where a sprinkler head was “directing flow onto an adjacent property hitting an exterior brick and mortar wall”;
  2. prepared an irrigation plan that “did not include two rotary sprinkler heads installed in the rear lawn”;
  3. did not affix a permanent sticker to the automatic controller;
  4. did not provide a completed maintenance checklist, a seasonal watering schedule, a list of components that need maintenance, or the installation statement the rule prints.

Each item names its provision. The sticker and the checklist are each cited under 344.63 and also under 344.35(d)(11), the irrigator’s general duty to finish the job.

The rules the four allegations turn on

Where the water goes: 344.62(b)(3)

The rule reads: “Pop-up spray heads or rotary sprinkler heads must direct flow away from any adjacent surface and shall not be installed closer than four inches from a hardscape”. The allegation here is about the first half. The rule’s next sentence allows an exemption: narrow paved walkways, jogging paths, golf cart paths or other small areas in cemeteries, parks, golf courses or other public areas may be exempted if the runoff drains into a landscaped area. The list of hardscapes is open: “such as, but not limited to” a building foundation, a fence, concrete, asphalt, pavers or stones set with mortar.

When the plan stops matching the ground: 344.61(d) and (e)

Under 344.61(d), the licensed irrigator may change the plan during installation if the change is “clearly documented in red ink on the irrigation plan” and does not weaken the system or break the chapter. 344.61(e) then says “All changes to the irrigation plan shall be documented as an as-built drawing.” The definition in 344.1(2) asks the as-built to “reflect all changes made to the original irrigation plan” and to show the location of all elements. Two rotors in the back lawn that the plan does not show would be that kind of change, and 344.63(4) requires the plan or as-built “indicating the actual installation” to go to the owner.

What the owner gets at the end: 344.63

344.63 lists four items owed on completion by the irrigator or technician who supervised the installation:

ItemWhat the rule asks
(1) Walk throughA final walk through with the owner or the owner’s representative to explain how the system works
(2) Maintenance checklistSigned by the owner and signed, dated and sealed by the irrigator or technician; the owner keeps the original and the irrigator a copy. It includes the controller manual (if there is a controller), a seasonal watering schedule, the components that need maintenance and how often, and the installation statement
(3) StickerPermanent, waterproof ink, with the irrigator’s name, license number, company name, telephone number and the dates of the warranty period, on each automatic controller
(4) Plan or as-builtThe irrigation plan or as-built drawing showing the system as actually installed

Two details in that list are easy to miss. If the system is manual, the sticker goes on the original maintenance checklist (344.63(3)). If the owner will not sign the checklist, the irrigator notes the time and date of the refusal on the owner’s signature line (344.63(2)).

The settlement

The order assessed $1,546. Of that, $1,237 was paid and $309 was deferred, to be waived only on full compliance with the order. Within 30 days of the order’s effective date the respondent was to put in place procedures so that future installations meet the 344.62 design and installation minimums, carry complete and accurate plans under 344.61, and end with the checklist, watering schedule, component list and statement under 344.35 and 344.63. Written certification with supporting records was due within 45 days. The order also recognizes that a permanent sticker was put on the controller at the Schertz site on January 23, 2024.

For the exam: the four items in 344.63

One job produced four allegations, and three of them concern the plan and the hand-over. For study, 344.63 is worth knowing as a numbered list: the walk through, the checklist and its four listed contents, the sticker and its five details, and the plan or as-built. Practice questions on completion and the sticker are in the Installation section, and the plan rules in 344.61 sit behind the Design section.